A machine tool that has been out of service for months or years should not automatically be treated as production-ready. Time away from production can affect lubrication, seals, electrical components, exposed surfaces, batteries, fluids, and mechanical assemblies.
A structured recommissioning process can help identify those concerns before the machine is placed under load.
Start with Condition, Not the Power Switch
Before energizing the machine, inspect its general condition and available maintenance history. Look for corrosion, damaged wiring, fluid leaks, contamination, missing guards, deteriorated hoses, and signs that water or debris entered the machine.
Lubrication and hydraulic reservoirs should be checked for fluid level and condition. Filters, lines, meters, and pumps may also require attention.
If the machine has a CNC control, backup batteries and stored machine data should be considered before power is applied or removed.
Lubrication Must Reach the Machine
A full reservoir does not prove that lubricant is reaching every required surface. Lines can become blocked, meters can fail, and pumps can lose their ability to deliver oil.
Moving an axis before proper lubrication has been confirmed can damage ways, liners, screws, and bearings. The lubrication system should be verified before extended cycling begins.
Bring Systems Back Gradually
Once preliminary checks are complete, machine functions should be introduced in a controlled sequence. Motors, pumps, axes, spindle speeds, tool-changing functions, and hydraulic or pneumatic operations can be observed individually.
Watch for:
- Abnormal noise or vibration
- Rising temperature
- Leaks
- Sticking valves or cylinders
- Rough axis movement
- Unexpected alarms
- Loss of position
- Inconsistent clamping
The machine should then be leveled, aligned, and evaluated for the work it will perform.
Recommission with a Clear Plan